Leave Your Message
*Name Cannot be empty!
* Enter product details such as size, color,materials etc. and other specific requirements to receive an accurate quote. Cannot be empty
Successful joint trial production of the first 400-meter ultra-long intelligent fully integrated mining face in the Balassu coal industry
Industry News
News list
Featured Products

Successful joint trial production of the first 400-meter ultra-long intelligent fully integrated mining face in the Balassu coal industry

2024-12-17

On December 14th, in the intelligent control center of Balassu Coal Company, as Wei Dong, secretary of the Party committee and chairman of the mining company, pressed the one-button start button of the 2201 fully integrated mining face, he heard the tone of “the crusher is ready to start, please pay attention to the face personnel, the belt conveyor is ready to start, the face personnel, please pay attention, the scraper is ready to start, the face personnel, please pay attention, the shearer is ready to start, the face personnel, please pay attention...”, everyone stared at the surveillance video, accompanied by the continuous flow of coal from the reprinting machine to the belt side, The automatic coal cutting, sliding, and shifting of the working face are all in normal operation, marking the successful joint trial production of the 2201 intelligent fully integrated mining face of Balassu Coal Company.

640.png

The success of this joint trial production is not only another milestone moment in the new journey of Balassu Coal Company, but also a major event in the process of high-quality development for mining companies.This will be the beginning of a new chapter of intelligent coal mining by Balassu Coal Company. At the same time, it will also provide a replicable and reference extension plan for the efficient mining of medium and thick coal seams under complex geological conditions in the coal industry.

640.webp

It is reported that before the one-click launch ceremony, Wei Dong and his party went deep into the 2201 comprehensive mining face site, listened to and checked the selection and matching of the intelligent face equipment, and learned more about the management of the initial mining and initial release site and the degree of intelligent application of the site.

640 (1).webp

 

Wei Dong put forward requirements for intelligent work on the spot. One is to improve the understanding of intelligent thinking, gradually explore and realize a new mode of production, dispatch, contact, and control through voice communication, and remotely control related equipment on the work surface through the console, so as to realize the remote control of all comprehensive mining equipment in the intelligent control center, and maximize the application of intelligence to all aspects of production; the second is to deeply integrate intelligent technology with safe production, firmly establish the development concept of “science and technology are safe, and fewer people are safe”, and strengthen the management of weak links and plug safety management loopholes by strengthening on-site safety intelligent control; the third is to innovate The team management mechanism should continuously optimize the maintenance link of the work surface, and take the “inventory” maintenance as an important guarantee for safe production. It is necessary to grasp the daily maintenance plan, strictly control material costs, and ensure the follow-up safety, stability, high efficiency and high yield of the long work surface.

Statement: This website respects originality. The source of this article is: My Steel Network. If there is any infringement, please contact to delete it.